Help us direct you to the right place to sign up
CompStak Research · 2026 Midterm Elections
Democrats are set to control both chambers of Congress in January, while the White House keeps its veto. They flipped 7 Senate seats and 6 governorships, and in the House they had 228 seats called to Republicans' 139, with 68 races still uncalled as of Wednesday morning. We used CompStak lease, sale and property data to look at three themes the new map puts in play: tariffs and industrial trade, office-to-housing conversion and the state-by-state fight over data centers. Each section rates its own markets or states from a landlord's point of view, beside that state's election results.
A split government could move these themes in different directions. On trade, a Democratic Congress may push to roll back tariffs, but any rollback would likely need to survive a veto or come through negotiation, so current tariffs could stay in place longer than some expect. On housing, office-to-residential conversion incentives may have a better chance as part of a bipartisan housing supply package, which could matter most for owners of older office in markets where landlords are already offering heavy concessions. On data centers, the biggest changes may come from statehouses rather than Washington, as newly elected governors could revisit approvals, tax incentives and grid rules.
What changed on November 3
Seats after the election, split by whether the winning party held the seat or flipped it from the other party.
Democrat heldFlipped to DemocratUncalledFlipped to RepublicanRepublican held
Sources: CBS News: 2026 Senate results; NBC: races left to call and seats flipped; MultiState: 2026 governor results; House counts in the introduction from AP results via Duane Morris Government Strategies, as of 7 a.m. ET on November 4.
Notes: Senate and governor results as of the evening of Wednesday, November 4, 2026, and may change as uncalled races are decided. Senate seats include the two independents who caucus with Democrats. Flips compare the winner's party with the party that held the seat before the election. The House is not shown here: Democrats won control, but dozens of races were still uncalled.
Governors may matter as much as Congress for these themes, since they control permitting, incentives, economic development and state budgets. Democrats flipped 6 governorships. Two of those states hold markets in this piece: Texas (Dallas–Fort Worth and Houston) and Georgia (Atlanta). Texas and Georgia, along with Ohio, Iowa and Nevada, are also among the 20 data center states in section 3, where a new governor could revisit permitting pauses or incentives.
1 · Tariffs and trade: industrial
Rolling back tariffs is a stated plank of the House New Democrats' affordability agenda, though any rollback would likely need to survive a veto or come through negotiation. Industrial markets where most leasing comes from goods-related tenants could be among the first to feel a change in trade volume, especially those tied to import volume from ports. We define those as transportation, warehousing and storage; retail; apparel; consumer durables; technology hardware and equipment; and automobiles and components.
Landlord outlook: industrial markets
Each market is rated 1 to 5 against the other seven on two measures: goods exposure, the share of industrial leasing from goods-related tenants (5 = highest), and rent momentum, the change in starting rent on those leases over the last 24 months (5 = strongest growth). The outlook columns show how each tariff path could lean for industrial landlords, using the rule in the notes.
| Market | Goods exposure | Rent momentum | If tariffs stay | If tariffs ease | Senate | Governor |
|---|---|---|---|---|---|---|
| New Jersey – North and Central | 5 | 2 | Possible downside | Possible upside | ||
| Atlanta | 5 | 4 | Mixed | Possible upside | ||
| Los Angeles–Orange–Inland | 4 | 1 | Possible downside | Possible upside | ||
| Dallas–Fort Worth | 4 | 5 | Mixed | Possible upside | ||
| Phoenix | 3 | 2 | Mixed | Little change | ||
| Chicago Metro | 2 | 4 | Little change | Little change | ||
| Philadelphia | 2 | 3 | Little change | Little change | ||
| Houston | 1 | 5 | Little change | Little change |
Ratings:1 Low2345 High· Landlord outlook: Possible upside, Mixed, Little change, Possible downside
Election blocks:Democrat heldFlipped to DemocratUncalledFlipped to RepublicanRepublican heldNo race
Sources: CompStak lease comps, industrial space only, the last 24 months and the 24 months before; election results as listed under the results section.
Notes: Goods-related industries are transportation, warehousing and storage; retail; apparel; consumer durables; technology hardware and equipment; and automobiles and components. Rent momentum uses starting rents, adjusted to a net lease type. Outlook columns apply a stated rule to CompStak data and are not forecasts; the rule is under Method and limits. House results will be added once district counts settle.
Los Angeles may be the clearest case of trade exposure in our data. It is the only one of these eight markets where industrial starting rent on goods-related leases fell meaningfully, from a size-weighted $15.55 per SF in the prior 24 months to $12.73 in the last 24, a change of -18.1%. Goods-related tenants account for 71% of its industrial lease transactions, and free rent as a share of lease term on its goods-related industrial leases rose from 2.0% in 2023 to 5.0% in 2026 so far. North and Central New Jersey, the other large port market here, has the highest goods-related share at 80%, with starting rent flat at $16.05.
Goods-related leasing and what those tenants pay
Left: goods-related industries' share of all industrial lease transactions. Right: starting rent, $/SF/yr, on industrial leases signed by goods-related tenants only, the prior 24 months against the last 24, with the change.
Goods-related share of all leasesGoods-related starting rent, prior 24 monthsLast 24 months, rent upLast 24 months, rent downLast 24 months, change under one percent
Sources: CompStak lease comps, industrial space only, the last 24 months and the 24 months before.
Notes: Rents are weighted by transaction size. Starting rents on industrial leases are adjusted to a net lease type. Goods-related industries are transportation, warehousing and storage; retail; apparel; consumer durables; technology hardware and equipment; and automobiles and components.
Port container volume, January through August
Total TEU handled January through August each year. The figure at right is the change from 2025.
202420252026Hover a port for all three years.
Sources: Container volumes as reported by each port.
Notes: TEU is twenty-foot equivalent units, year to date through August. Los Angeles and Long Beach together serve the LA / OC / Inland market, New York and New Jersey serves North and Central NJ, and Savannah feeds Atlanta.
Seaport-related markets: average effective rent by year
Industrial, $/SF/yr, by year signed.
Each line is one market, labelled at its 2026 year-to-date value. Hover a point for that year's rent and the change since 2023.
Sources: CompStak lease comps.
Notes: Effective rents are adjusted to a net lease type and include work value and free months when given. 2026 is year to date. Atlanta is included as the inland feeder for the Port of Savannah.
GridlockTariffs may largely stay. Rent pressure and rising concessions in Los Angeles could persist; inland hubs, where rents are still rising, may hold up better.
Bipartisan rollbackImport volumes could recover. Port markets with heavy concessions may have the most room to tighten.
What to watchRental rate trends in the nation's major port-related markets of Los Angeles and North and Central New Jersey.
Find more industrial data on CompStak:Get Started
2 · Office to housing conversion
Converting vacant commercial properties to housing is part of the House New Democrats' affordability agenda, and a bipartisan housing package the Senate passed in June includes pilot grants for converting vacant buildings to housing and asks HUD to develop zoning best practices for localities. Incentives could be most effective where the math is close: older office trading cheaply in markets where landlords are already paying heavy concessions to fill space.
Landlord outlook: office markets
Each market is rated 1 to 5 against the other 10 on three measures: sale price, the size-weighted Class B and C office sale price per SF (5 = lowest price); concessions, free rent as a share of lease term (5 = heaviest); and housing demand, the metro rental vacancy rate (5 = lowest vacancy rate). The conversion score averages the three percentile ranks on a 0 to 100 scale, and the main hurdle is each market's weakest measure. The outlook shows how federal conversion incentives could lean for owners of older office.
| Market | Low sale price | Concessions | Housing demand | Conversion score | Main hurdle | If incentives pass | Senate | Governor |
|---|---|---|---|---|---|---|---|---|
| Chicago Metro | 5 | 5 | 4 | 82 | Housing vacancy | Possible upside | ||
| Boston | 4 | 4 | 5 | 73 | Sale price | Possible upside | ||
| Washington, DC | 3 | 5 | 3 | 67 | Housing vacancy | Leaning upside | ||
| Bay Area | 2 | 4 | 5 | 64 | Sale price | Leaning upside | ||
| Los Angeles–Orange–Inland | 2 | 3 | 5 | 58 | Sale price | Leaning upside | ||
| New York City | 1 | 5 | 3 | 52 | Sale price | Mixed | ||
| Atlanta | 5 | 2 | 1 | 48 | Housing vacancy | Mixed | ||
| San Francisco | 1 | 3 | 4 | 48 | Sale price | Mixed | ||
| Philadelphia | 5 | 1 | 2 | 42 | Concessions | Little change | ||
| Phoenix | 4 | 2 | 2 | 42 | Concessions | Little change | ||
| Dallas–Fort Worth | 3 | 1 | 1 | 24 | Housing vacancy | Little change |
Ratings:1 Low2345 High· Landlord outlook: Possible upside, Leaning upside, Mixed, Little change
Election blocks:Democrat heldFlipped to DemocratUncalledFlipped to RepublicanRepublican heldNo race
Sources: CompStak sale comps (Class B and C office sale price, portfolio sales excluded) and lease comps (free rent as a share of term), last 24 months; U.S. Census Bureau, Housing Vacancy Survey (metro rental vacancy, last four quarters); election results as listed under the results section.
Notes: Washington, DC shows Virginia's Senate and Maryland's governor results. Full rule under Method and limits.
The conventional conversion story centers on New York, but our data suggests older office is the most expensive to buy there: Class B and C office traded at a size-weighted $332 per SF over the last 24 months, the highest of these 11 markets, which holds its conversion score to 52. Chicago and Boston score highest, at 82 and 73, because they rank well on all three measures: Chicago at $91 per SF, free rent of 6.2% of lease term and rental vacancy of 5.4%, and Boston at $190, 5.6% and 4.9%, against a vacancy median of 5.5%. Washington, DC has the heaviest concessions, at 8.1% of term, but its sale price sits right at the median and its rental vacancy is higher, at 6.2%. Philadelphia, Phoenix, Atlanta and Dallas–Fort Worth fall below the median on both concessions and housing demand.
Class B and C sale price vs. landlord concessions
Class B and C office sale price against average free rent as a share of lease term, by market. Upper left is where conversion incentives could matter most. Dashed lines are the medians of these 11 markets.
Sources: CompStak sale comps (sale price) and CompStak lease comps (free rent), Class B and C office, last 24 months.
Notes: Sale price is size-weighted. Full method under Method and limits.
Rental housing: vacancy in 2019 and now
Metro rental vacancy, 2019 average against the last four quarters (Q4 2025 to Q3 2026). The median of the 11 markets for the last four quarters is 5.5%.
2019Last 4 quarters, looser than 2019Last 4 quarters, tighter than 2019Within half a point of 2019Hover a market for its Census metro areas.
Sources: U.S. Census Bureau, Housing Vacancy Survey.
Notes: Metro-wide, all rental housing, with margins of error of roughly 1 to 3 points; the change is directional. More under Method and limits.
GridlockFederal incentives could stall, leaving conversions largely a city and state program story.
Bipartisan supply billHousing supply has had cross-party support. Low-priced Class B and C office in high-concession markets could move first.
What to watchClass B/C sale pricing and buyer mix; a widening discount to Class A could signal conversion buyers.
Find more office data on CompStak:Get Started
3 · Data centers: a state-by-state fight
Data centers are now one of the most contested land uses in the country, and the rules are being written by governors, legislatures and local voters rather than Congress. Two states have paused approvals outright, three have paused or frozen tax incentives, and voters in several states passed local bans on November 3. Where data centers get built next year may depend as much on this map as on power and land.
The rest of this section looks at the 20 states with the most reported data center power on US Data Center Map, counting operating, under construction and planned capacity. These are the states developers are already targeting, and the question here is which of them are best positioned, not where data centers could go next.
Texas shows how state policy could outweigh capacity. It has 19.5 GW of data center capacity already under construction, more than any other state, but Gov. Abbott froze new approvals in August pending an audit of a roughly 474 GW grid connection queue, and state environmental permits were suspended in September. Projects already in the ground can keep delivering; new starts wait. That helps explain why Texas rates only 1 of 5 on our site rating below.
Data center site rating
New Mexico, North Dakota, Louisiana and Wyoming rate highest: each generates more electricity than it sells, has large sites at under $10,000 an acre and has seen no major state action. New Mexico also has the cheapest industrial power of the group, at 5.85¢ per kWh. Virginia, the biggest data center market, rates 2 of 5: it generates only 72.1% of what it sells, the least of these states, and its industrial power, at 9.49¢ per kWh, is among the most expensive. Texas has the largest pipeline and cheap power, at 6.35¢ per kWh, but rates 1, with paused approvals and land priced above the median.
The 20 states on a map
Pick a layer to color the map. Hover a state for its full profile.
No major state action foundContestedIncentives pausedPausedNot in the 20
Power rating:1 Least favorable2345 Most favorableNot ratedNot in the 20
Land price rating (cheaper is higher):1 Least favorable2345 Most favorableNot ratedNot in the 20
3.4–5.0 GW5.0–7.8 GW7.8–11.8 GW11.8–19.4 GW19.4–93.1 GWNot in the 20
Sources: US Data Center Map (state list, pipeline); EIA Electric Power Annual 2025 (power); CompStak sale comps and property records (land price, building size); 2026 news coverage (policy); CBS News, NBC and MultiState (elections).
Notes: Ratings use the site rating method; Utah and West Virginia show as not rated on the rating, power and land layers. States outside the 20 are shown in light gray. Full method under Method and limits.
Each factor rated 1 (least favorable) to 5 (most favorable) against the other states: a bigger power surplus and cheaper industrial power, cheaper large land sites and less state opposition rate higher. The score averages the three percentile ranks, equally weighted, on a 0 to 100 scale; the overall rating sets fixed score cutoffs: 5 at 70 or above, 4 at 55 to 69, 3 at 45 to 54, 2 at 35 to 44 and 1 below 35. Pipeline is shown for context and not scored.
| Rank | State | Power | Land price | Policy | Score | Overall | Landlord outlook | Senate | Governor | Pipeline (GW) |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | New Mexico | 5 | 5 | 4 | 85 | 5 | Possible upside | 15.7 | ||
| 2 | North Dakota | 4 | 5 | 4 | 85 | 5 | Possible upside | 3.4 | ||
| 3 | Louisiana | 4 | 5 | 4 | 76 | 5 | Possible upside | 5.8 | ||
| 4 | Wyoming | 4 | 4 | 4 | 74 | 5 | Possible upside | 5.1 | ||
| 5 | Oklahoma | 4 | 5 | 3 | 69 | 4 | Leaning upside | 3.9 | ||
| 6 | Iowa | 4 | 3 | 4 | 65 | 4 | Leaning upside | 4.3 | ||
| 7 | Kentucky | 3 | 2 | 4 | 56 | 4 | Leaning upside | 7.9 | ||
| 8 | Missouri | 2 | 4 | 4 | 56 | 4 | Leaning upside | 4.6 | ||
| 9 | Georgia | 3 | 4 | 3 | 53 | 3 | Mixed | 19.8 | ||
| 10 | Nevada | 3 | 1 | 4 | 47 | 3 | Mixed | 7.7 | ||
| 11 | Pennsylvania | 3 | 2 | 3 | 46 | 3 | Mixed | 23.1 | ||
| 12 | Indiana | 2 | 1 | 4 | 43 | 2 | Leaning downside | 8.7 | ||
| 13 | Virginia | 1 | 3 | 3 | 36 | 2 | Leaning downside | 31.6 | ||
| 14 | Ohio | 2 | 3 | 2 | 33 | 1 | Possible downside | 17.6 | ||
| 15 | Texas | 4 | 2 | 1 | 32 | 1 | Possible downside | 93.1 | ||
| 16 | Illinois | 3 | 2 | 2 | 32 | 1 | Possible downside | 10.6 | ||
| 17 | Arizona | 4 | 1 | 2 | 31 | 1 | Possible downside | 10.7 | ||
| 18 | New York | 1 | 4 | 1 | 30 | 1 | Possible downside | 6.1 |
Ratings:1 Low2345 High· Landlord outlook: Possible upside, Leaning upside, Mixed, Leaning downside, Possible downside
Election blocks:Democrat heldFlipped to DemocratUncalledFlipped to RepublicanRepublican heldNo race
Sources: U.S. Energy Information Administration, Electric Power Annual 2025 (Tables 3.7, 2.8 and 2.10) for power; CompStak sale comps for land price; 2026 news coverage for policy, listed under the policy tracker below; US Data Center Map (Oct 2026) for the state list and pipeline.
Notes: Pipeline is reported data center capacity under construction plus planned, in GW, as listed on US Data Center Map; operating capacity is not included, and planned projects are announced, not confirmed. Power combines power surplus and industrial power price. Ratings are percentile ranks among the 18 of these states with a land price; Utah and West Virginia are not rated because of limited land sale data. Full method and caveats under Method and limits.
State policy tracker
What each state did on data centers in 2026, as reported through November 4. States are in order of capacity under construction.
| State | Under construction (GW) | Planned (GW) | Policy climate | What happened in 2026 |
|---|---|---|---|---|
| Texas | 19.5 | 73.6 | Paused | Gov. Abbott halted new data center approvals in August pending a PUC/ERCOT audit of a ~474 GW interconnection queue; TCEQ environmental permits suspended in September. No end date; Legislature returns January 2027 under a newly elected Democratic governor. |
| Virginia | 8.3 | 23.3 | Contested | Gov. Spanberger issued a data center accountability framework in September and opposes a statewide ban; a moratorium bill (HB 1515) was introduced and Loudoun County is weighing a pause. Legislature takes it up in January. |
| Pennsylvania | 8.1 | 15.0 | Contested | Three-year moratorium bill on 25 MW+ 'high impact' data centers (HB 2533) introduced; not enacted. |
| Indiana | 4.1 | 4.6 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| Ohio | 3.8 | 13.8 | Incentives paused | Gov. DeWine paused the data center tax break program pending a study. On Nov 3, Ohio had 21 local data center measures; bans passed in Upper Sandusky, Conneaut, Trenton, Pataskala, Piqua, Oregon and Sunbury. |
| Nevada | 2.8 | 4.9 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| Louisiana | 2.8 | 3.0 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| New Mexico | 2.5 | 13.2 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| Wyoming | 1.9 | 3.2 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| Missouri | 1.9 | 2.7 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| Illinois | 1.9 | 8.7 | Incentives paused | Gov. Pritzker paused state data center tax incentives for agreements after July 1. On Nov 3, Bloomington voters backed an advisory moratorium and Joliet voters rejected a pro-data-center question. |
| Iowa | 1.4 | 2.9 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| Arizona | 1.4 | 9.3 | Incentives paused | Budget deal froze new state data center tax incentive applications for three years. AG Mayes proposed a statewide moratorium, which Gov. Hobbs opposes; Tucson fought Amazon-linked Project Blue over water. |
| Georgia | 1.2 | 18.6 | Contested | 2026 bills to repeal the sales tax break and protect ratepayers died without a House vote; a local permitting moratorium bill (HB 1059) was introduced. Data centers were a campaign issue in the governor's race. |
| North Dakota | 0.9 | 2.5 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| Kentucky | 0.9 | 7.0 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| New York | 0.4 | 5.7 | Paused | Gov. Hochul's July executive order pauses state permits for projects of 50 MW+ for up to a year; the Legislature also passed a one-year moratorium bill in June that remains unsigned. |
| Oklahoma | 0.3 | 3.6 | Contested | Moratorium bill on 100 MW+ construction (SB 1488) introduced; not enacted. |
| Utah | 0.2 | 19.1 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
| West Virginia | 0.0 | 13.4 | No major state action found | No statewide moratorium, incentive pause or major restriction found in our review; local opposition may still exist. |
Sources: US Data Center Map: data centers by state (Oct 2026); Washington Examiner: Abbott's data center moratorium stirs mixed reactions in Texas; Enerdata: Texas freezes data centre permits; Troutman Pepper Locke: Data center backlash widens as Texas freezes 474 GW grid queue; Axios: Hochul signs data center moratorium executive order; Rockefeller Institute: More moratoriums on data centers; Insurance Journal: Illinois joins Ohio in pausing data center tax credits; ABC15: Hobbs and Biggs find common ground on data centers; WSET: Virginia lawmakers split on Spanberger's data center executive order; WTOP: Democrats see Georgia's failure to curb data centers as an electoral gift; SAVRN: U.S. Data Center Moratorium Tracker.
Notes: States: the 20 with the most reported data center power on US Data Center Map, October 2026. Capacity figures are announced or reported projects, not confirmed construction.
Large land sites in the top 20 data center states
Median price per acre on land sales of 50 acres or more over the last 36 months. Each state's figures are on the map above, under the Land price layer.
Large sites are cheapest in North Dakota, New Mexico and Oklahoma, at medians of $5,630, $7,911 and $8,562 per acre, and most expensive in Arizona and Nevada, at $92,817 and $26,560. Virginia, the largest data center market, sits mid-pack on the median at $11,934, but its size-weighted average runs to $100,293, as does Indiana's at $101,525. In both states, a few high-priced sites pull the average well above the typical sale. Median prices rose over the last 12 months in every policy group, paused states included, and there are too few large land sales in Texas since its August freeze to show an effect yet.
Voters weighed in on November 3
Local ballot measures; partial results as reported the day after the election.
- Ohio: bans or hyperscale limits passed in Upper Sandusky, Conneaut, Trenton, Pataskala, Piqua, Oregon and Sunbury; Monroeville rejected a pro-data-center advisory question.
- Kansas: El Dorado, Emporia and Ottawa passed bans on large or "high impact" data centers.
- Illinois: Bloomington backed an advisory moratorium; Joliet voters rejected a pro-data-center question.
- California: Alhambra banned data centers in all city zones, following an earlier ban in Monterey Park.
- Maine: Wells voted on a six-month moratorium; results were still being reported.
Watch list: states outside the top 20
- Maine: the Legislature passed the first statewide moratorium bill (LD 307, 20 MW+); Gov. Mills vetoed it in April.
- Moratorium bills introduced but not enacted: Maryland, Michigan, Minnesota, New Hampshire, South Carolina, South Dakota, Vermont and Wisconsin.
- Local pauses: Groton, CT and Bangor, ME, among hundreds of local moratoriums tracked nationally this year.
Data center buildings are getting bigger
The typical data center building in CompStak's property records has grown from 86,270 SF for those built before 1990 to 227,352 SF for those built since 2020. Across all vintages, the national median is 119,000 SF. Among the 20 states, Nevada, Utah and Arizona have the largest typical buildings, at 300,000 SF, 191,654 SF and 184,306 SF. Virginia sits above the national median at 155,292 SF, and Indiana and Ohio sit below it, at 57,534 SF and 69,826 SF.
Median data center building size by year built
Square feet, United States.
Median building sizeMost recent vintageHover a bar for the median and the average.
Sources: CompStak property records.
Notes: Buildings with property subtype Communication/Data Center and property type Industrial, which hold most of the data center stock; data center buildings typed Office are left out. Building size and year built as recorded.
Next 12 monthsCapacity already under construction in Virginia, Pennsylvania, Texas, Indiana and Ohio is likely to keep delivering; new starts could shift toward states with fewer restrictions.
January sessionsTexas, Virginia and Georgia legislatures could take up data center rules, Texas and Georgia under newly elected governors.
What to watchPowered land and industrial sale pricing near grid capacity, and whether local bans spread beyond Ohio and Kansas.
Find more land and property data on CompStak:Get Started
Method and limits
- Landlord outlook matrices: each section rates its own markets or states. Factors are percentile ranks within the section, banded 1 to 5. The outlook columns apply the rules below to CompStak data and are not forecasts. Election blocks show Senate and governor results for each market's state as of the evening of Wednesday, November 4, 2026 (CBS News, NBC, MultiState); House results will be added once district counts settle.
- Industrial outlook rule: goods exposure is goods-related industries' share of industrial lease transactions; rent momentum is the change in size-weighted starting rent on goods-related leases, last 24 months against the 24 before. If tariffs stay: Possible downside where goods exposure is at or above the eight-market median and rents were flat or falling (under 1%), Mixed where only one of those holds, Little change otherwise. If tariffs ease: Possible upside where goods exposure is at or above the median, Little change otherwise.
- Office outlook rule: each market gets a percentile rank among the 11 on three measures: lower Class B and C sale price per SF, higher free rent as a share of lease term, and lower rental vacancy. The conversion score is the average of the three ranks, from 0 to 100, and the main hurdle is the measure with the lowest rank. If federal conversion incentives pass: Possible upside at a score of 70 or above, Leaning upside at 55 to 69, Mixed at 45 to 54, Little change below 45. The cutoffs are a judgment call, not a statistical break, so markets near a cutoff could reasonably sit in either band. Under gridlock, little is likely to change at the federal level.
- Tariffs section charts: goods-related industries' share of industrial lease transactions, and size-weighted industrial starting rent on goods-related leases only, the last 24 months against the 24 months before, for eight markets chosen for this section. Average effective rent by year for the five seaport-related markets (Atlanta included as the Savannah feeder) comes from the same source.
- Office conversion chart: Class B and C office sale price is total sale price divided by total square feet across CompStak sale comps closed November 2024 to October 2026 in 11 markets; free rent is the average share of lease term given as free rent on Class B and C office leases over the last 24 months. Rental vacancy is the Census Housing Vacancy Survey metro rate, averaged over Q4 2025 to Q3 2026, for all rental housing across the metro, not downtown only. Bay Area and LA / OC / Inland are simple averages of their metros, and San Francisco shares the San Francisco-Oakland-Fremont metro with the Bay Area. Metro estimates carry margins of error of roughly 1 to 3 points, and the window spans the 2026 metro boundary revision.
- Data center site rating: covers the 20 states with the most reported data center power (operating, under construction and planned) on US Data Center Map (October 2026), the states developers are already targeting; the 18 with a CompStak land price are rated, and Utah and West Virginia are left out because of limited land sale data. Power combines two equally weighted parts: power surplus, 2025 utility-scale net generation as a share of electricity sales to customers (above 100% means the state generates more than it sells), and the 2025 average industrial electricity price (lower is better), both from the EIA Electric Power Annual 2025. Power surplus measures annual energy, not peak capacity or how long it takes to connect a large load, and grids cross state lines, so it approximates available power. Land price is the median $/acre on land sales of 50 acres or more, November 2023 to October 2026. Policy scores paused 0, incentives paused 0.4, contested 0.7 and no major state action found 1; the policy climate is our reading of 2026 news coverage. Each factor is a percentile rank among the 18 states, the three are averaged with equal weight, and the overall rating uses fixed score cutoffs, the same as the office matrix where they overlap: 5 at 70 or above, 4 at 55 to 69, 3 at 45 to 54, 2 at 35 to 44 and 1 below 35. Landlord outlook, for owners of land and industrial property: Possible upside for 5, Leaning upside for 4, Mixed for 3, Leaning downside for 2 and Possible downside for 1. The cutoffs are a judgment call, not a statistical break.
- Data center building size: CompStak property records with property subtype Communication/Data Center and property type Industrial, median building size by decade built nationally and by state for the top 20 states; state medians cover every vintage, and states with limited data are N/A.
- Large land sites (top 20 states): CompStak land sale comps of 50 acres or more by transaction size, November 2023 to October 2026. Price per acre is total sale price divided by transaction size in acres; the median is reported with the size-weighted average beside it, and states with limited data are N/A. The median is the middle sale; the size-weighted average divides total price by total acres, so a few high-priced sites pull it up. Land prices say nothing about power, water or fiber, which usually decide data center siting.
- Policy inputs come from published 2026 Democratic agendas, 2026 news coverage of state data center actions (dated and linked under the policy tracker) and election results as of the evening of November 4. Nothing here predicts which bills pass. Interest rates and capital markets could move these markets more than policy in 2027.
- This is market data for discussion, not investment advice.
Run the same analysis on your own markets.
Compare starting rents, concessions, sale pricing and land values across the markets you cover.
Frequently asked questions
How could the 2026 midterm elections affect commercial real estate?
Democrats control both chambers of Congress from January while the White House keeps its veto, so most federal change would need to survive a veto or come through negotiation. This analysis tracks three themes that split puts in play: tariffs and industrial trade, office-to-housing conversion, and the state-by-state fight over data centers. Governors may matter as much as Congress, because permitting, incentives, economic development and state budgets run through them, and Democrats flipped 6 governorships.
What were the results of the November 3, 2026 midterm elections?
Democrats hold 54 Senate seats to 44, with 2 races uncalled, after flipping 7 seats in Texas, South Carolina, Kansas, Maine, Iowa, Ohio and North Carolina. They hold 29 governorships to 20, with 1 uncalled, after flipping 6. In the House, 228 seats were called for Democrats and 139 for Republicans, with 68 races outstanding as of 7 a.m. ET on November 4, 2026.
Which industrial markets are most exposed to tariffs?
North and Central New Jersey carries the highest goods-related exposure of the eight markets measured, at 80% of industrial lease transactions, followed by Atlanta at 75% and Los Angeles, Orange and Inland at 71%. Los Angeles is where that exposure already shows in the data: starting rent on goods-related industrial leases fell from $15.55 to $12.73 per SF over the last 24 months, a change of -18.1%, and free rent rose from 2.0% of lease term in 2023 to 5.0% in 2026 so far.
Which office markets are best positioned for office-to-residential conversion?
Chicago and Boston score highest on our conversion score, at 82 and 73 out of 100, because they rank well on all three measures: a low Class B and C office sale price, heavy landlord concessions and tight rental housing. Chicago sits at $91 per SF with free rent at 6.2% of lease term and rental vacancy of 5.4%. New York scores 52 despite the attention it receives, because older office is the most expensive to buy of the 11 markets, at $332 per SF.
Which states have paused data center approvals or tax incentives?
Texas and New York have paused approvals outright, and Ohio, Illinois and Arizona have paused or frozen state tax incentives. Virginia, Pennsylvania, Georgia and Oklahoma are contested, with bills introduced but not enacted. Voters also passed local bans on November 3 in Ohio, Kansas, Illinois and California. Of the 20 states with the most reported data center power, the remaining 11 showed no major state action in our review.
Which states rate best for new data center development?
New Mexico, North Dakota, Louisiana and Wyoming rate 5 of 5 on our site rating, which combines power surplus and industrial power price, the cost of large land sites and state policy openness. Each generates more electricity than it sells and has large sites at under $10,000 an acre. New Mexico has the cheapest industrial power of the group, at 5.85¢ per kWh. Texas rates 1 of 5 despite 19.5 GW under construction, more than any other state, because new approvals have been paused since August.
How much have data center buildings grown?
The median data center building in CompStak's property records has grown from 86,270 SF for those built before 1990 to 227,352 SF for those built since 2020, roughly 2.6 times larger. Across all vintages the national median is 119,000 SF. Nevada, Utah and Arizona have the largest typical buildings of the 20 states.
How does CompStak verify its lease and sale comps?
Every comp is processed by a multi-step data verification system, including machine learning algorithms, statistical anomaly detection, and a team of CRE data analysts. The lease, sale and property figures on this page come from that database, alongside the EIA Electric Power Annual 2025, the Census Housing Vacancy Survey and US Data Center Map, each cited beside the chart or table it supports.
See the comps behind the analysis.
Every rent, concession and sale figure on this page comes from CompStak lease, sale and property comps.
Get StartedRelated Posts
CompStat: DOGE Fallout in DC, Dollar Stores under Pressure, and Aging Warehouses
CompStat: DOGE Fallout in DC, Dollar Stores under Pressure, and Aging Warehouses
MARKET INTEL: Analyzing Manhattan's Most Valuable Office Deals, 2019 - 2022
MARKET INTEL: Analyzing Manhattan's Most Valuable Office Deals, 2019 - 2022
CompStak Portfolio Series: BXP, Inc. vs. Perform Properties